I've only got 1 week left before our maiden voyage to Redfish Lake (near Stanley, ID). I've still got a lot to do- final painting, headliner, flooring, to name a few. The good thing is I have all the seating installed and could technically use it today if I had to, but nobody wants that. I will not however be doing anything in the bathroom for this trip. I'll get to that later, but that's okay- Redfish has shower's and bathroom with flushing toilets- YES!
I got all the cabinets repainted and new hardware installed. Spencer did a good job sanding for me.
All the windows were removed and replaced with new putty tape. I decided to apply clear silicone along the top of the windows as well, but I'm not sure if it's really necessary. I figure it's a little added insurance.
I got the new captain's chairs installed. They work great. I found them at a junkyard- they were out of a mini-van. They swivel and slide forward and backwards. They are really comfortable and it will be fun to sit and watch TV while we drive down the road- that's right, I got the TV installed. It is awesome!
The cab is coming along as well. I installed the carpet and the seats.
The new seat covers from stockinteriors.com are really nice. I highly
recommend them.
The couch went in after a little fabrication/modification work. It
was difficult to position it and get it exactly where it needed to go,
so I was thrilled when I finally got that done.
I need to take a few more pictures before this post is ready, but since I have only 1 follower (thanks Sherry), I think I'll go live now and not worry too much about it.
Viva la Camper! I do believe I shall be eating crow for dinner all week at redfish. This RV has really come together! I think you sold me once the floor was in :)
ReplyDeleteCant wait for the first of our MANY camping adventures!!!!!